Energy News  
NASA Continues Assessment Of The Next Shuttle Mission

STS-119 Commander Lee Archambault (left) and Pilot Tony Antonelli, pose for a photo in the cockpit of a NASA DC-9 aircraft prior to a Heavy Aircraft Training session at Ellington Field near NASA's Johnson Space Center in Houston. Photo credit: NASA/JSC
by Staff Writers
Cape Canaveral FL (SPX) Feb 09, 2009
Because of an ongoing review of the space shuttle's flow control valves, NASA managers are rescheduling meetings next week to assess the launch readiness of shuttle Discovery's STS-119 mission to the International Space Station.

The Space Shuttle Program will hold a meeting Feb. 13 to review data and determine whether to move forward with a flight readiness review on Feb. 18.

The official launch date will be set at the readiness review, but for planning purposes launch now is no earlier than Feb. 22. There are three valves that channel gaseous hydrogen from the shuttle's main engines to the external fuel tank.

One of these valves in shuttle Endeavour was found to be damaged after its mission in November. As a precaution, Discovery's three gaseous hydrogen valves were removed, inspected and reinstalled.

Space shuttle Discovery's STS-119 crew is set to fly the S6 truss segment and install the final set of power-generating solar arrays to the International Space Station.

The S6 truss, with its set of large U.S. solar arrays, will complete the backbone of the station and provide one-fourth of the total power needed to support a crew of six.

The two solar array wings each have 115-foot-long arrays, for a total wing span of 240 feet. They will generate 66 kilowatts of electricity - enough to provide about 30 2,800-square-foot homes with power.

Commander Lee Archambault will lead Discovery's crew of seven, along with Pilot Tony Antonelli, and Mission Specialists Joseph Acaba, John Phillips, Steve Swanson, Richard Arnold and Japan Aerospace Exploration Agency astronaut Koichi Wakata.

Wakata will replace Expedition 18 Flight Engineer Sandra Magnus, who will return to Earth with the STS-119 crew. Wakata will serve as a flight engineer for Expeditions 18 and 19, and return to Earth with the STS-127 crew.

Discovery's STS-119 mission to the International Space Station is targeted to lift off no earlier than Feb. 22.

Share This Article With Planet Earth
del.icio.usdel.icio.us DiggDigg RedditReddit
YahooMyWebYahooMyWeb GoogleGoogle FacebookFacebook



Related Links
Space Shuttle
Shuttle at NASA
Watch NASA TV via Space.TV
Space Shuttle News at Space-Travel.Com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Discovery Facing More Delays
Washington (AFP) Feb 7, 2009
The space shuttle Discovery's mission to the International Space Station (ISS) has been again delayed until no sooner than February 22 for testing of three flow control valves, NASA said Saturday.







  • Analysis: The scoop on buying green power
  • Analysis: Green business going strong
  • US green groups hail reversal of Bush-era land lease
  • Analysis: Azerbaijan crucial to gas export

  • France looks to boost nuclear energy exports
  • Analysis: Nuclear revival in Sweden
  • US Nuclear Power Plants Achieved Near-Record Level Of Production In 2008
  • Sweden reverses decision to phase out nuclear power

  • Science In The Stratosphere
  • Americans Owe Five Months Of Their Lives To Cleaner Air
  • Does Global Warming Lead To A Change In Upper Atmospheric Transport
  • Greenhouse gas emissions study released

  • Row in Brazil over reforestation reduction
  • Climate change threatens Lebanon's legendary cedars
  • Brazilian Indians fleeing bulldozers: group
  • Congo must do more for forests: NGO

  • Safety scandal hits China's dairy exports: state media
  • West African nations team up to fight caterpillars
  • Too Much TV Linked To Future Fast-Food Intake
  • How A Brain Chemical Changes Locusts From Harmless Grasshoppers To Swarming Pests

  • Tesla shifts electric sedan site to win US government loan
  • Toyota Eco-Friendly Dealerships Lead In Environmental Construction
  • Development Center For Hybrid And Electric Vehicle Battery Systems
  • California applauds Obama environmental measures

  • Bank of China extends massive credit to state aircraft maker
  • Shanghai Airlines seeks capital injection
  • China Eastern may take three years to be profitable: chairman
  • First China-assembled Airbus set for May test flight: report

  • Nuclear Power In Space - Part 2
  • Nuclear Power In Space
  • Outside View: Nuclear future in space

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2007 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement