![]() |
Tokyo, Japan (SPX) Mar 30, 2009 The Japan Aerospace Exploration Agency (JAXA) and Mitsubishi Heavy Industries performed a cryogenic inspection for the first captive firing test (setting the X-time or firing time at 11:30 a.m.) on March 27, 2009 (all times and dates are Japan Standard Time) at the Tanegashima Space Center. After reviewing the data acquired through the inspection, we confirmed that the cryogenic inspection went well except that an abnormal phenomenon in the coolant supply occurred during the automatic countdown sequence of the inspection. We immediately studied the situation and carried out all possible corrective measures against the abnormality; however, we found it was difficult to timely restore the normal operation. Therefore, we decided to postpone the captive firing test that was scheduled to take place after the cryogenic inspection. We will investigate the cause and take appropriate measures. The new test date will be announced as soon as it is determined. Share This Article With Planet Earth
Related Links Japan Aerospace Exploration Agency (JAXA) Rocket Science News at Space-Travel.Com
Sacramento CA (SPX) Mar 30, 2009Aerojet has announced that its second-stage liquid engine for the United Launch Alliance (ULA) Delta II rocket helped boost Lockheed Martin's GPS IIR-20(M) satellite to orbit for the U.S. Air Force's Global Positioning System. |
|
| The content herein, unless otherwise known to be public domain, are Copyright 1995-2007 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement |